17/02/2011 - 2 Meeting with the construction manager
Now that the shell is nearly complete to notify the site manager. On the way home I was called upon again if I had time.
On the site we went through the house again and we have the most important things considered. There was a short, rough information about the timetable and other issues that have accumulated in the meantime have been answered.
The artisans were busy again. The interior walls upstairs were finished, the roof was 3 / 4 covered with foil, so it is not quite so much rain is coming. Parts of the roof overhangs were already installed and primed - we look forward to the personal contribution - :-(
recoating in the next working week, the roof is then covered well, the windows should be installed also we should with the. Electricians take to the number and location of outlets and light switches spot set.