26/02/2011 - Another step further
Again, our craftsmen have used the weather.
work, except the window sills done, until there are 2 rooms already installed on all windows. The roller shutters have been installed.
And - for the first time - there are 2 small (hopefully) little problems.
the bathroom above, we had moved before construction started on the shutter electrically. As it was now prepared, but there is a belt. But is rather a small problem. And after we have completed our bathroom planning, it would not be too bad. We thought we would poorly on the belt, because the pan is directly under the window. Since we have settled on a 6-gon-well, but we get to the belt. Let's see what we do.
The larger of the two problems is the shame wall. This was in accordance. a preliminary draft set. After the meeting, to the operator for the sanitary objects, we had changed the dimensions and position of the objects. There had also agreed on the spot again to discuss the exact location of individual things. Should also create the tile the wall, so that they can possibly be adapted to the tile heights. At least we had all understood ..... But since we're 2 1 / 2 months waiting for the offer by the tile, we have not in black and white. By then we would have noticed that the wall of shame "something is not right."
Let's see what the construction manager on Monday.