From the outside, now is almost all done. The roof overhangs are covered, except for 2 windows are the clinkered window sills finished.
missing is
- the joints
- the financial statements on the balcony to the roof - are made when the joints are done
- masking the house and patio doors at the bottom so that the frame is below protected from moisture
in the dry farmer who still insulate the attic floor and the ceiling and dress must have for the electrician can install the latest cable.
And now a few pictures from the house - in sunshine and without scaffolding, and the cable clutter.
0 comments:
Post a Comment