03/06/2011 - From the outside (almost) everything done

From the outside, now is almost all done. The roof overhangs are covered, except for 2 windows are the clinkered window sills finished.
missing is

  • the joints
  • the financial statements on the balcony to the roof - are made when the joints are done
  • masking the house and patio doors at the bottom so that the frame is below protected from moisture
Even the electrician was busy. The doses are so far prepared inside all the cables that are later to go outside in the garage after a run, as are almost all cables for outdoor lighting. A final left front is missing - there is so far only the hole drilled. Now we wait
in the dry farmer who still insulate the attic floor and the ceiling and dress must have for the electrician can install the latest cable.

And now a few pictures from the house - in sunshine and without scaffolding, and the cable clutter.