03/02/2011 - The house is close
After our first little "problems" has the same construction manager at reported Monday. The wall will be dismantled and built by the tile in place, He also has this "set" that we receive the outstanding offer promptly. And lo and behold - on Tuesday evening it was there. Does it :-) Even though the additional cost caused by re-builders wishes ...
The shutters we are left so that we keep the manual drive and get a credit for the engine.
Yesterday morning we had 2 classes. Clock at 8:00 with the electrician, at 9:30 clock with a company for gardening and landscaping.
When we arrived at 8 clock on the building site, the artisans have been busy. While we went with the electrician to the house, had to freeze out the present Roofing (inside it was However, not much warmer). Then it
went room by room through the house. We have submitted our requests, the electrician has added or changed - based on his experiences. Somewhere in between, we have then "agreed".
While we went into the next room, began the apprentice ever to drill the holes for the can. Just no time to waste.
After 2 hours we were then and still have a sample case for the selected switch series get to where we should look at home.
The Lord of the horticultural company will have to wait because, unfortunately, but it was faster for him. He has the property considered and give copies of the management plan, to let it know which areas should be paved. Has asked us for our needs - and then he was gone. The offer is there then in the next 2-3 weeks.
This morning I then returned the suitcase to the site - and was greeted with a catalog of electric lamps, with the offer. The time went so fast.
We went through the points again, but not insignificant, owing to the additional costs then anything deleted. The most expensive here, the connections for the network, the connections for the television cans (Leerrrohre in the standard) and the flush-mounted thermostats for floor heating - the standard surface mount boxes have been there probably intended (which was never stated but ....). This then, the satellite system ... But that has indeed paid off rather quickly when I have the expense of cable operators on the other hand count.
The misplaced shame wall was already gone, was the biggest surprise, however: the house is covered completely! Missing only the clinkered window sills - but that they may have already started this morning.
0 comments:
Post a Comment