Wednesday, November 17, 2010

Catapult Designs Blueprints

17.11.2010 - Bathroom Planning I + Land

Today we were the first in a bathroom design bathroom showrooms. We were a little early there, and could still go through the exhibition, before the consultants had time for us.
The consultant has first considered our first draft and asked us about our wishes.
for the guest bathroom, he had the price of property developer in the enclosed article in a Musterbad we have so taken over. Our bathroom
we then rescheduled.
The shower was moved farther toward the outer wall, thus we can save a shower and need just a regular disc. The shower you enter then the wall side, which included the hanging towel radiator.
From our corner bath, we also separated. First, would the otherwise rectilinear space "agitated" act, the other is for my size (1.90 cm) unsuitable. He beat us with a hexagonal tank with a large floor. I sat in a similar to the sample - because look at the knee will no longer swimming in the water :-)
Here, the current draft:

then we've also been on the property. It goes on! As the construction workers were
despite the rainy weather, but quite busy.
The construction road was built and piled the soil so that tomorrow can be started with the base plate.

0 comments:

Post a Comment